leaky20 avatar

Renovation Part VI: Cabinet Installation

leaky20

Published: 02 Jun 2024 › Updated: 02 Jun 2024Renovation Part VI: Cabinet Installation

Renovation Part VI: Cabinet Installation

Another week has passed and its time for another house update.

1000003798.jpg

This week was an exciting one for us with a lot of fun changes to be seen in a very short period of time. I went over to the house each day to check things out and see the progress. Things are really starting to take shape and come together now. Let's take a look shall we.

20240531_163906.jpg

Maybe I'll start with the most boring parts of the project and move my way up from there to the more exciting stuff.

20240531_163845.jpg

There was a pretty big difference in height between the tile floor and the hardwood but the contractor did a good job bridging the two surfaces seamlessly. My wife really wanted the transition to be flush, without needing a step down transition, and the contractor was able to figure it out by shimmying one end of the hardood up on a slight angle. It turned out quite nice overall.

20240530_173812.jpg

Previously I talked about the contractor wanting to put in a wood finish below our window that is similar to what we have below our bay window on the side of the house.

20240530_173827.jpg

We wanted that spot to be filled with brick though, even if the brick didn't match the existing perfectly.

20240530_173756.jpg

In the end they found a brick that was actually pretty close and we are completely fine with the way it turned out. You can see the difference - obviously, but its not all that apparent unless you are looking directly at it and its not in a place that you would stare at normally anyway. It has faded and blended a little more than the photo portrays too. I took that shot when the mortar was still wet at the time. I could probably throw some dust on the bricks to really fade them in if I wanted to. Overall though, the peace of mind that there will be no maintenance or chance of water leakage or damage is worth it to me. Wood needs to be painted periodically and is more subject to mold and leakage if not done right. You never know what kind of wood the contractor would install and it would be easier for them to cheap out to save themselves money that way. Not that I think our contractor would cheap out. They have actually been very good so far. They are very professional and do a really good job with everything. Nonetheless, brick seemed the safer bet to us.

20240529_182750.jpg

Okay, now we will go into the bathroom.

20240529_182744.jpg

They've started to install the floating vanity and linen tower.

20240531_163938.jpg

The walnut wood veneer turned out really great in my opinion.

20240531_163943.jpg

The handles that my wife found online work perfectly too. They look pretty custom actually. It was an awesome find on her part.

20240527_200458.jpg

They started bringing in the cabinets last week and this week they brought in more.

20240527_200451.jpg

It's crazy how much material goes into cabinets.

20240527_194736.jpg

Since a lot of it was disassembled, we spent a lot of time trying to figure out what each part was and where it would go.

20240527_194719.jpg

20240527_194134.jpg

It was really good to be able to finally see the stain that we chose. We had only ever seen it on the small sample piece that we had, so we didn't really know how it would all look on a larger scale.

20240527_194704.jpg

We were nervous leading up to it, thinking that maybe it would turn out to be too orangey or too red or something.

20240527_194125.jpg

We were very pleased when we finally saw it in person. The wood grain of the walnut is really something.

20240528_184145.jpg

20240528_182232.jpg

20240528_182602.jpg

They installed more and more cabinets each day of the week so every evening that I went to look it was at a different stage in progress.

20240529_182424.jpg

The doors were the last to be added.

20240529_182400.jpg

Here's another angle.

20240529_182409.jpg

The pantry was the same.

20240527_193906.jpg

We went with a green color in the pantry to save money, for something different and because it still has that mid century modern look that we are going for. I think that it will go nicely with the walnut wood that we chose for the coffee bar and wine rack as well.

20240528_182713.jpg

They won't be able to finish installing the upper cabinets in the pantry until the counter is installed because the uppers sit directly on top of the counter. So that will probably be in two weeks time.

20240528_182722.jpg

You're all caught up now. Next week they do the painting, followed by installing the countertops. We currently have four more weeks to go but I'll keep you updated.

If you're interested in seeing more of this project then feel free to click on the link to my previous post below. There will also be a lot more to come. So until next time, thanks for stopping by.

Renovation Part V: Tiles

Leave Renovation Part VI: Cabinet Installation to:

Written by

Travel and food blog. Sometimes posts about Film and Music Analysis, Psychology, Philosophy, and Random Ideas.

Read more #interiordesign posts


Best Posts From leaky20

We have not curated any of leaky20's posts yet. But you can encourage our curation team to review posts by visiting them regularly and by referring other readers. Because we give priority to frequently read content.

More Posts From leaky20