Published: 21 May 2020 › Updated: 21 May 2020
Moving Out of Building and Planning New Mining Container Build
We shut down the mining facility in the leased warehouse space and are consolidating into one location. Planning on taking the existing infrastructure and putting it into a shipping container for mining. This is a good summer project while our ASIC miner utilization is lower right after the Bitcoin halving.
Video of shutdown mining facility:
Video of planning the new shipping container:
Check out my store for commonly used mining accessories. Interested in consulting, recommendations, advice, support, or hosting your miners? We can do that at North Georgia Crypto Mining
Also find the BlockOps Bitcoin and Crypto Mining Podcast on:
- Spotify
- Breaker
- Google Podcasts
- RadioPublic
BlockOps Crypto Mining Podcast - home for all the podcast episodes
Blog Posts:
- Bitcoin Mining is the Skin in the Game of the Next Economy
- Planning Your Bitcoin Mining Operation
- Actions for Miners to Take During The Cryptocurrency Price Cycle
- How Semiconductor Process Technology Affects ASIC Miner Profitability
- The Mining Algo Technology Progression – CPU->GPU->FPGA->ASIC
- The first mining facility I built - 40 miners
- Second Bitcoin and Crypto mining facility - 500 miners
- North Georgia Crypto Mining 900 miner buildout - this is a good design!
- First International Shipping Container system - 150 to 300 miners
- Most Popular Video on YouTube - Tips for Small Bitcoin Miners to Maximize Their Advantages
- Second most popular video - CryptoCurrency Mining Strategies and What I am Mining Sept 2017
Posted from my blog with SteemPress : https://blockoperations.com/moving-out-of-building-and-planning-new-mining-container-build/
Leave Moving Out of Building and Planning New Mining Container Build to:
Read more #bitcoin posts
Best Posts From Rolf Versluis
We have not curated any of blockops's posts yet. But you can encourage our curation team to review posts by visiting them regularly and by referring other readers. Because we give priority to frequently read content.
More Posts From Rolf Versluis
- Cloud Infrastructure and Microservices are the Future
- Interview at Crypto Mining Tools Podcast with Scott Offord and Ethan Zurka
- Electrical Overview of 800 kW Bitcoin mining facility while shutdown
- Moving Out of Building and Planning New Mining Container Build
- Video Interview with CryptoRich on Horizen and Mining March 2020
- Podcast Episode 8 - March 2020 Actions and Mining Farm Maintenance
- Podcast Episode 7 - GPU mining and New Crypto Selection
- Podcast Episode 6 - Bitcoin Mining Profitability, Percentages, and Partnering
- Podcast Episode 5 - Optimizing power efficiency in miners and the facility
- Podcast Episode 4 - Building a cooling system for 1 megawatt Bitcoin mining facility