20211006 Bungalow construction (removing formwork) - day 92
The concrete pour of the main slab happened more than 28 days ago which means that the curing process of the concrete is complete and it is safe to remove the formwork supporting the slab.
Steps to go from the garden/parking to the main floor will rest against the foundation wall on the left.
Inside the workshop
The pentagonal column supports the center of the main bungalow.
Workshop corridor.
Underside of the cantilevered terrace under the main bungalow.
Here you can see the entrance of the workshop corridor under the main bungalow. The Sanggah temple will be erected where the wood pile is on this photo.
Some of the wood/bamboo which made the formwork that was removed from under the slab.
Leave 20211006 Bungalow construction (removing formwork) - day 92 to:
Read more #pentarchitecture posts
Best Posts From Igor Bogdanov
We have not curated any of igb's posts yet. But you can encourage our curation team to review posts by visiting them regularly and by referring other readers. Because we give priority to frequently read content.
More Posts From Igor Bogdanov
- 20211207 Bungalow construction (door lock reference) - day 154
- 20211203 Bungalow construction (bedroom shutters) - day 150
- 20211201 Bungalow construction (workshop steps) - day 148
- 20211129 Bungalow construction (water well digging complete) - day 146
- 20211128 Bungalow construction (ceiling fixtures) - day 145
- 20211126 Bungalow construction (Trimdek walls) - day 143
- 20211124 Bungalow construction (Sanggah temple complete) - day 141
- 20211123 Bungalow construction (outdoor light fixtures) - day 140
- 20211121 Bungalow construction (cement tiles) - day 138
- 20211119 Bungalow construction (window glass install) - day 136