20210827 Bungalow construction (formwork removed) - day 52
The formwork of the concrete pour from 2 days ago has been removed. Brick walls have been added to extend concrete walls where scheduled.
Recessed space for the rainwater evacuation system in the corridor that leads to the workshop.
In one instance the formwork has moved during the pour. It has created a concrete bulge at the bottom of this wall. This photo doesn't really capture it but it is a displacement of several centimeters.
You see the shadow of the bulge here. We will triple check formwork before future pours.
All the other walls look great.
This will be the workbench at 90cm high. It is scheduled to be covered with a couple layers of 18mm plywood.
There were a few misalignments in the formwork of the columns. This one is kinda playful. A happy accident.
This one is less interesting but is outside and will be hidden behind the trimdek (undulated metal) skin.
Overall this pour was a success.
Formwork for the pentagonal column at the centre of the workshop is ready.
Concept drawing for the pentagonal column formwork.
Adi holds the pentagonal shape of the column which served as a guide to create the formwork.
Some of the earth from the excavation of the workshop is brought to another part of the garden to fill old irrigation canals.
Leave 20210827 Bungalow construction (formwork removed) - day 52 to:
Read more #pentarchitecture posts
Best Posts From Igor Bogdanov
We have not curated any of igb's posts yet. But you can encourage our curation team to review posts by visiting them regularly and by referring other readers. Because we give priority to frequently read content.
More Posts From Igor Bogdanov
- 20211207 Bungalow construction (door lock reference) - day 154
- 20211203 Bungalow construction (bedroom shutters) - day 150
- 20211201 Bungalow construction (workshop steps) - day 148
- 20211129 Bungalow construction (water well digging complete) - day 146
- 20211128 Bungalow construction (ceiling fixtures) - day 145
- 20211126 Bungalow construction (Trimdek walls) - day 143
- 20211124 Bungalow construction (Sanggah temple complete) - day 141
- 20211123 Bungalow construction (outdoor light fixtures) - day 140
- 20211121 Bungalow construction (cement tiles) - day 138
- 20211119 Bungalow construction (window glass install) - day 136