20210824 Bungalow construction (workshop formwork) - day 49
Finishing the formwork and getting ready for the big day (tomorrow) during which we will pour the floor and the walls of the workshop in one go.
Connecting the rebars of the workshop "bowl" to the slab.
Andi making sure things are done right.
Adi in the middle of it all.
Two views of the outside corridor to access workshop.
Outside wall and slab columns. Water pipes and space for the second sceptic in front.
Outer side of the wall.
One of the angles of the pentagonal structure. 108 degrees.
Leave 20210824 Bungalow construction (workshop formwork) - day 49 to:
Read more #hive-159893 posts
Best Posts From Igor Bogdanov
We have not curated any of igb's posts yet. But you can encourage our curation team to review posts by visiting them regularly and by referring other readers. Because we give priority to frequently read content.
More Posts From Igor Bogdanov
- 20211207 Bungalow construction (door lock reference) - day 154
- 20211203 Bungalow construction (bedroom shutters) - day 150
- 20211201 Bungalow construction (workshop steps) - day 148
- 20211129 Bungalow construction (water well digging complete) - day 146
- 20211128 Bungalow construction (ceiling fixtures) - day 145
- 20211126 Bungalow construction (Trimdek walls) - day 143
- 20211124 Bungalow construction (Sanggah temple complete) - day 141
- 20211123 Bungalow construction (outdoor light fixtures) - day 140
- 20211121 Bungalow construction (cement tiles) - day 138
- 20211119 Bungalow construction (window glass install) - day 136