20210820 Bungalow construction (concrete columns) - day 45
The white line that frames the bedroom is a 3cm x 3cm metal square tubing that will help create the 3cm step to stop rain water from going inside. It will be removed once the concrete is cured.
Metal base plates for the columns at each angle.
The concrete columns that will support the outer part of the floating slab which will become the floor of the living room are complete.
Metal to reinforce the beams of that concrete slab.
The steps of the outside corridor that will lead to the entrance of the workshop are taking shape.
Leave 20210820 Bungalow construction (concrete columns) - day 45 to:
Read more #pentarchitecture posts
Best Posts From Igor Bogdanov
We have not curated any of igb's posts yet. But you can encourage our curation team to review posts by visiting them regularly and by referring other readers. Because we give priority to frequently read content.
More Posts From Igor Bogdanov
- 20211207 Bungalow construction (door lock reference) - day 154
- 20211203 Bungalow construction (bedroom shutters) - day 150
- 20211201 Bungalow construction (workshop steps) - day 148
- 20211129 Bungalow construction (water well digging complete) - day 146
- 20211128 Bungalow construction (ceiling fixtures) - day 145
- 20211126 Bungalow construction (Trimdek walls) - day 143
- 20211124 Bungalow construction (Sanggah temple complete) - day 141
- 20211123 Bungalow construction (outdoor light fixtures) - day 140
- 20211121 Bungalow construction (cement tiles) - day 138
- 20211119 Bungalow construction (window glass install) - day 136